Planning a renovation in Tbilisi and wondering what it actually costs? Whether you're an expat who just bought a Soviet-era apartment in Saburtalo, or an investor picking up a new-build in Isani, this guide covers real 2025 market prices — not estimates pulled from thin air.
We'll break down what each renovation type includes, what drives costs up or down, and how to avoid the common traps that leave people paying 30–50% more than they expected.
Three Renovation Types and Their Prices
Painting walls, replacing flooring, refreshing the bathroom without structural changes. Timeline: 2–4 weeks for a 50 m² apartment.
Complete replacement of electrical wiring and plumbing, wall levelling, new partitions, full finishing. Timeline: 7–12 weeks.
Custom design project, premium materials, bespoke solutions. Timeline: 10–18 weeks.
Detailed Price Breakdown 2026
From real Construction Georgia quotes 2026. Rate: ₾1 ≈ $0.37 (2.7 ₾/$). Labour only — materials not included.
| Work type | Price (GEL) | ≈ USD | Unit |
|---|---|---|---|
| Demolition | |||
| Tile removal (floor & walls) | ₾22 | ~$8 | m² |
| Laminate removal | ₾11 | ~$4 | m² |
| Paint stripping | ₾5.5 | ~$2 | m² |
| Block partition demolition | ₾22 | ~$8 | m² |
| Door removal | ₾33 | ~$12 | pcs |
| Floors | |||
| Floor waterproofing | ₾19.8 | ~$7 | m² |
| Self-leveling floor / screed | ₾42.9 | ~$16 | m² |
| LVT (luxury vinyl tile) installation | ₾30.8 | ~$11 | m² |
| Large-format porcelain tile (1200×200 mm) | ₾130 | ~$48 | m² |
| Tile joint grouting | ₾12 | ~$4.5 | m² |
| MDF skirting board | ₾38 | ~$14 | l.m. |
| Walls | |||
| Cement plaster (wet areas) | ₾41.8 | ~$15 | m² |
| Wall putty — 2 coats | ₾27.5 | ~$10 | m² |
| Fiberglass mesh wallpaper | ₾14.3 | ~$5 | m² |
| Wall painting — 2 coats | ₾13.2 | ~$5 | m² |
| Wall tile 600×600 mm | ₾107.8 | ~$40 | m² |
| 45° mitre cut on tile edges | ₾107.8 | ~$40 | l.m. |
| Soundproof drywall partition 100 mm | ₾66 | ~$24 | m² |
| Interior door + casing installation | ₾275 | ~$102 | pcs |
| Ceiling | |||
| Stretch ceiling installation | ₾42.9 | ~$16 | m² |
| Backing frame for recessed spotlight | ₾19.8 | ~$7 | pcs |
| Recessed spotlight installation | ₾33 | ~$12 | pcs |
| Electrical | |||
| Wall chasing | ₾16 | ~$6 | l.m. |
| Cable pulling (up to 4 mm²) | ₾5.7 | ~$2 | l.m. |
| Socket box drilling & installation | ₾17.6 | ~$6.5 | pcs |
| Socket / switch installation | ₾13.2 | ~$5 | pcs |
| Distribution board (36 modules) | ₾198 + ₾20.9/mod | ~$73 + ~$8/mod | set |
| Plumbing | |||
| Hot / cold water outlet point | ₾71.5 | ~$26 | point |
| Drainage outlet point | ₾99 | ~$37 | point |
| In-floor drain with water trap | ₾104.5 | ~$39 | pcs |
| Radiator / towel rail installation | ₾132 | ~$49 | pcs |
| Concealed mixer installation | ₾165 | ~$61 | pcs |
| In-wall toilet frame (rough-in) | ₾300 | ~$111 | pcs |
| In-wall toilet (finish: bowl + button) | ₾132 | ~$49 | pcs |
| Wall-hung basin installation | ₾143 | ~$53 | pcs |
| General | |||
| Construction debris hauling | ₾495 | ~$183 | trip |
What Drives the Final Cost
1. Apartment type
Soviet-era buildings (Saburtalo, Didube, Gldani) carry hidden costs: replacing aluminium wiring, repairing floor screeds, dealing with moisture damage. New-build apartments in areas like Isani start from scratch — more predictable, but require a full scope of work from day one.
2. Square footage
Apartments above 80 m² typically see a 10–15% per-metre discount as the crew works more efficiently. Small apartments (under 35 m²) often cost more per metre — bathrooms, corridors and awkward corners make up a disproportionately large share of the work.
3. Material grade
Tiles alone can double your bathroom cost: Italian porcelain vs Georgian or Turkish mid-range is a 3–4× price difference. We offer material packages at different price points and never push the most expensive option.
4. Condition surprises
Our free pre-survey identifies issues before work starts — mould behind old tiles, rotting wooden floors in historic buildings, undersized electrical panels. These get disclosed upfront and priced into the contract, not discovered at week 4 with a request for extra payment.
How the Quote Works
We don't give verbal estimates. After an engineer visits, you receive a detailed quote with:
- A line-item list of all work types and volumes
- Material costs (replaceable with your own selections)
- Timelines for each phase
- A fixed total that won't change
Tbilisi vs Other Cities
| City | Cosmetic | Capital |
|---|---|---|
| Tbilisi (2025) | $100–150/m² | $300–500/m² |
| Tel Aviv (2025) | $350–500/m² | $700–1,200/m² |
| Berlin (2025) | €200–350/m² | €600–1,000/m² |
| Batumi (2025) | $90–140/m² | $280–480/m² |
Tbilisi offers competitive pricing relative to Western Europe and Israel, with international-standard quality — particularly relevant for expats used to higher home markets.
Common Mistakes When Choosing a Contractor
- Accepting a vague quote. "Around $15,000" without itemisation almost always ends in 30–50% overspend.
- Choosing on price alone. The lowest quote in Tbilisi typically means missing guarantees, substandard materials, or scope underestimated on paper.
- Working without a written contract. Verbal agreements are common in Georgia's construction market. Without a signed contract, you have no legal protection.
- Skipping portfolio verification. Ask for photos of real completed projects and client contacts. Any reputable contractor will provide this immediately.
Quick Price Calculator
Want a ballpark before calling us? Use our AI cost calculator — enter your square footage and renovation type for a price range in 30 seconds. It's not a replacement for a proper quote, but gives a solid budget starting point.
Get an Exact Quote
Free engineer visit, detailed quote within 24 hours. Price is locked in the contract.
Request a Free Estimate