You send the estimate
Whichever way suits you — WhatsApp, email or any messenger. Attach the drawings if you have them.
A contractor sent you a renovation or construction estimate and you cannot tell whether it is fair or padded. We check it line by line — recalculate quantities against your drawings, compare rates with the real Tbilisi market and show you exactly what you are being overcharged for. Before you sign anything.
We accept Excel, PDF, photos of printed pages and paper estimates. Drawings — if you have them.
We prepare and defend estimates ourselves — from apartments to industrial tenders. So we know the actual tricks used to inflate them, not the theory.
Six stages. None of them is «we will take a look and tell you» — each one produces a document or a line in the report.
Hover a card to expand
We transfer your estimate into a working spreadsheet line by line, normalise every item to consistent units and group them by type of work: demolition, rough works, engineering systems, finishes. We immediately flag items with no described scope and no reference to a drawing — that is usually where the problems start.
We calculate wall, floor and ceiling areas from your layouts; lengths of skirting, cornices, chases and service runs; countable items — sockets, light fittings, doors, radiators. Every quantity is compared with the estimate and the discrepancy is recorded as a percentage and in money.
Labour rates are compared with our database of actual Tbilisi prices. Materials are compared with supplier price lists: brand, article number, availability. We calculate the mark-up on materials separately and flag any line that cannot be verified because it does not say what is actually being bought.
We compare the scope against the technology: substrate preparation, priming, waterproofing, screed, reveals, waste removal, hauling materials up, final cleaning. We produce a list of works that will certainly arrive as extras, with an indicative cost for each.
Payment schedule and amounts, advances, stage acceptance and sign-off, liability for missed deadlines, conditions under which the price may change, warranty and defect rectification, who buys the materials and how the spending is evidenced.
We send the report and get on a 40–60 minute call: we go through every finding, explain what is critical and what is not, and decide together what is worth negotiating first.
Line by line: item — quantity in the estimate — our quantity — price in the estimate — market price — difference. In Excel and PDF.
Overcharges plus missing works equals the real cost. You can see how much you are overpaying and how much is still unaccounted for.
Works that are not in the estimate but without which the project cannot be finished. With an indicative cost for each.
Clauses working against you, with ready wording for amendments: payment up front, vague acceptance, no penalties for delay.
What to push on first, where the contractor will concede and where the argument is pointless.
On the site-visit tariff: a dimensioned plan in PDF and DWG/DXF plus a room-by-room quantity schedule. Yours to keep.
So that you do not expect what we never promised.
Below are starting prices and turnaround times. We quote the exact price and deadline after an initial review of the estimate and the property — and we only start once you have approved them. After that the price does not change.
If you hire us for the renovation after the audit, the cost of the audit is deducted from our estimate.
When you have both the estimate and the design documentation. Fully remote — suitable for owners who are currently outside Georgia.
When there are no drawings, or the drawings carry no dimensions. We come out, measure the property and produce a dimensioned plan — without it there is nothing to check quantities against.
| Service | Price |
|---|---|
| Site supervision — single visit with a written report | $150 |
| Site supervision — 4 visits per month | from $500 |
| Site supervision — 8 visits per month | from $850 |
| Tender documentation, BOQ, commercial projects | quoted per project |
Prices are quoted in US dollars and paid in lari at the exchange rate on the day of payment. For reference: $4/m² ≈ 10.5 ₾/m².
Whichever way suits you — WhatsApp, email or any messenger. Attach the drawings if you have them.
We look at the estimate and the property and quote an exact price and deadline. We only start once you approve them.
Six stages: line items, quantities, rates, missing works, contract review.
We send the document and get on a call: we go through every point and decide what to do next.
A fair question. Here is the honest answer.
Whatever you decide afterwards. We do not require you to give us the project and never make it a condition.
The fee is fixed before we start. We have no incentive to inflate what we find — we get paid the same either way.
The cost of the audit is deducted from the first payment under the contract. You never pay twice for the same work.
Every month we buy materials and pay crews ourselves. So the report contains numbers, not «expert opinion».
Below is our own estimating and documentation practice. These are not audit client testimonials — they are the work the method grew out of.
The client supplied layouts in PDF without a single dimension. We reconstructed the geometry and produced a dimensioned drawing and a quantity schedule — the basis without which any estimate is guesswork.
Bilingual bills of quantities, verification of totals and formulas, a list of missing data without which no price can be given. We apply the same method to the estimate your contractor sent you.
Finishing quantities taken from the working documentation schedules rather than guessed from floor area. That gap is exactly where inflation usually lives.
Looking at the document and quoting the fee is free and commits you to nothing.